Skip to content
EvaForm

Foam Quality Testing, Acceptance Criteria and Reports

We test at four stages: incoming foam stock, first article after setup, in-process during the run, and final AQL sampling. This page lists the methods we use and the acceptance criteria we work to.

Test methods and acceptance

EVA foam test schedule
PropertyMethod / standardFrequencyAcceptance
DensityISO 845Incoming + first articleWithin ±10% of nominal
ThicknessMicrometer, 4-pointEvery setup + in-process±0.3 mm under 10 mm, ±5% above
HardnessASTM D2240 (Shore C)Incoming + first article±5 Shore
Compression setASTM D3574 (22 h / 70°C)Per lot, on request≤ 15%
Tensile strength / elongationASTM D3574Per material lotPer datasheet
Tear strengthASTM D3574Per material lotPer datasheet
Water absorptionASTM D3574 (24 h)Per material lot< 1% by volume
FlammabilityUL94 HB / V-0, FMVSS 302Per certified gradeCertificate supplied
Surface resistivityIEC 61340-5-1 / ASTM D257Per ESD lotWithin specified decade range
Colour matchVisual against approved chipFirst articleApproved chip on file
DimensionalCMM or gauge checkFirst article + AQLWithin drawing tolerance

Inspection levels

  • First article — full dimensional report before production starts.
  • In-process — cavity depth, thickness and colour checks at defined intervals.
  • Final — AQL 1.0 for critical dimensions, 2.5 for cosmetic, on a sample of the lot.
  • Documentation — first-article report, test certificates and a certificate of conformity on request.

Certifications held

Factory: ISO 9001:2015 quality management system, SGS audited. Materials: RoHS, REACH SVHC, UL94 HB / V-0 and FMVSS 302 grades available with test reports.

Start a project

Get a quote and a sample for your project

Send us the dimensions, a drawing or the physical part. You will get a written DFM review, a unit price and a sample plan within 12 business hours.

Or email sales@eva-form.com · MOQ from 1 piece · sample in 5–7 days · mass production 15–25 days

Frequently asked questions

Do you provide a first-article report?
Yes — a full dimensional first-article report is produced before production starts and is available on request.
What AQL level do you use?
AQL 1.0 for critical dimensions and 2.5 for cosmetic attributes.
Can you test ESD resistivity?
Yes, per IEC 61340-5-1 or ASTM D257, with a batch resistivity certificate.
Do you test flammability?
Yes — UL94 HB / V-0 and FMVSS 302 grades are available with test reports.
Can I get material documentation for a shipment?
Yes, batch-level RoHS and REACH documentation and a certificate of conformity are available.

Buyer specification checklist

What should I specify for the insert?

The core inputs are product size, weight, cavity depth, density, thickness and tolerance. EvaForm uses these six values to select the EVA grade and cutting route.

Which conversion process fits my part?

Die cutting is the most economical route for high-volume flat inserts. CNC routing suits multi-level cavities; molding fits deep 3D shapes.

What happens after I send a drawing?

You receive a DFM note, price and sample plan within one business day. Include quantity, colour or finish, destination port and target date.

Which standards guide the material choices?

EVA foam packaging is normally specified against ISO 9001 quality control, RoHS/REACH material compliance and UL 94 flammability classifications. These references help buyers compare suppliers on evidence rather than claims.

“Specify density, hardness and tolerance before discussing price; the rest is process selection.” — EvaForm Engineering Checklist