Skip to content
EvaForm
Quality

Quality System, Certifications and Documentation

Quality is managed as a system, not a final check. We run ISO 9001:2015, are SGS audited, and keep batch-level material declarations so documentation can be produced for a specific shipment. ISO published the sixth edition, ISO 9001:2026, on 16 September 2026; certificates issued to the 2015 edition stay valid through the transition period ending 15 September 2029, and our recertification is planned inside that window.

Certifications and compliance

Certifications
ScopeStandard / bodyStatus
Quality management systemISO 9001:2015Certified; transition to ISO 9001:2026 by 15 Sep 2029
Factory auditSGSAudited
Restricted substancesRoHS Directive 2011/65/EU as amendedCompliant, declaration supplied
Restricted substancesREACH SVHC candidate listDeclaration supplied per batch
Flammability (optional grades)UL94 HB / V-0Test report available
Flammability (transport)FMVSS 302Test report available
Electrostatic controlIEC 61340-5-1Batch resistivity certificate
Product safety (US)CA Prop 65 (on request)Declaration on request

Inspection points

  1. 01

    Incoming material

    Density, thickness and hardness checked on the foam stock, plus material declarations and, for certified grades, the test report.

  2. 02

    First article

    Full dimensional report after setup, before production starts.

  3. 03

    In-process

    Cavity depth, thickness and colour checked at defined intervals during the run.

  4. 04

    Final inspection

    AQL 1.0 for critical dimensions and 2.5 for cosmetic attributes, sampled from the finished lot.

  5. 05

    Release

    Certificate of conformity and, on request, the first-article report and test certificates.

Documentation we supply

  • First-article dimensional report
  • Certificate of conformity
  • Material declaration (RoHS / REACH)
  • Batch resistivity certificate for ESD grades
  • Flammability test report (UL94 / FMVSS 302)
  • Capability study for repeat orders
Start a project

Get a quote and a sample for your project

Send us the dimensions, a drawing or the physical part. You will get a written DFM review, a unit price and a sample plan within 12 business hours.

Or email sales@eva-form.com · MOQ from 1 piece · sample in 5–7 days · mass production 15–25 days

Frequently asked questions

Are you ISO 9001 certified?
Yes — ISO 9001:2015, and the factory is SGS audited. ISO 9001:2026 replaced the 2015 edition on 16 September 2026 with a transition deadline of 15 September 2029, so our current certificate remains valid while recertification runs.
Can you provide RoHS and REACH documentation?
Yes, material declarations are supplied per batch, with batch-level traceability.
Do you offer flame-retardant grades?
Yes — UL94 HB and V-0, plus FMVSS 302 for transport applications, with test reports.
Do you provide a first-article report?
Yes, a full dimensional first-article report is produced before production and supplied on request.
What AQL do you use?
AQL 1.0 for critical dimensions and 2.5 for cosmetic attributes.
Can we audit the factory?
Yes — customer audits are welcome, and we are already SGS audited.

Buyer specification checklist

What should I specify for the insert?

The core inputs are product size, weight, cavity depth, density, thickness and tolerance. EvaForm uses these six values to select the EVA grade and cutting route.

Which conversion process fits my part?

Die cutting is the most economical route for high-volume flat inserts. CNC routing suits multi-level cavities; molding fits deep 3D shapes.

What happens after I send a drawing?

You receive a DFM note, price and sample plan within one business day. Include quantity, colour or finish, destination port and target date.

Which standards guide the material choices?

EVA foam packaging is normally specified against ISO 9001 quality control, RoHS/REACH material compliance and UL 94 flammability classifications. These references help buyers compare suppliers on evidence rather than claims.

“Specify density, hardness and tolerance before discussing price; the rest is process selection.” — EvaForm Engineering Checklist